Feng Su | Bed & Breakfast in Donggang

| 9.7 (86 Reviews) |   3 Bedrooms  3 Bathrooms  14 Guests
Gongtouli Bed & Breakfast | Feng Su

3 Bedroom Bed & Breakfast in Gongtouli, Donggang

Feng Su features air-conditioned accommodations in Donggang. This beachfront property offers access to free Wifi. Love Pier is 20 miles away, and Kaohsiung Museum of History is 20 miles from the bed and breakfast. The bed and breakfast offers a flat-screen TV and a private bathroom with a hair dryer, free toiletries, and shower. The bed and breakfast provides some units with city views, and units have a kettle. At the bed and breakfast, every unit is fitted with bed linen and towels. If you'd like to discover the area, cycling and hiking are possible in the surrounding area, and Feng Su can arrange a bicycle rental service. Tujiacuo Beach is 1.7 miles from the accommodation, while Siaogang Station is 14 miles from the property. Kaohsiung International Airport is 14 miles away.

Feng Su is located in Donggang.

This 3 Bedrooms Bed & Breakfast is suitable for tourists and travelers. It has several amenities that would guarantee your comfort. These amenities include: Air Conditioner, Parking, View, and several others. This is a 3 star rated property and has over 86 reviews with the average score of 9.7 . Coming to Donggang and needing a place to stay? Be it for work or for leisure, consider staying at this Bed & Breakfast for your next visit, you will surely love it.

You can check the reviews and description of this 3 Bedrooms Bed & Breakfast if you want to learn more about this SunSki place in Donggang. These details are authentic, as they are provided by our partner, booking.com.

This Feng Su in Donggang is well equipped and has all facilities that have been listed below. Please note that these details were shared to us by booking.com for the listed “Feng Su”. We solely rely on their shared details and are regarded as “accurate”. If you have any concerns about the information or accuracy describing this Bed & Breakfast, please let us know.

Show more
 
No. 19, Jiaxin 2nd Street, Donggang, 928, Taiwan

Amenities

Air ConditionerAir Conditioner
ParkingParking
ViewView
Ocean ViewOcean View
OceanfrontOceanfront
Security/SafetySecurity/Safety
Sports/ActivitiesSports/Activities
Bedding/LinensBedding/Linens
Guest ServicesGuest Services
Child FriendlyChild Friendly
InternetInternet
KitchenKitchen

Facility Overview

ParkingParking
  • Free parkingFree parking
  • ParkingParking
ActivitiesActivities
  • Water parkWater park
  • HikingHiking
  • WindsurfingWindsurfing
  • CanoeingCanoeing
  • CyclingCycling
  • BeachBeach
  • BeachfrontBeachfront
GeneralGeneral
  • Air conditioningAir conditioning
  • Smoke-free propertySmoke-free property
  • Adults onlyAdults only
  • Non-smoking roomsNon-smoking rooms
Guest ServicesGuest Services
  • Invoice providedInvoice provided
InternetInternet
  • Free WifiFree Wifi
  • InternetInternet
  • WifiWifi
Security/SafetySecurity/Safety
  • Smoke alarmsSmoke alarms
  • CCTV in common areasCCTV in common areas
  • CCTV outside propertyCCTV outside property
  • Fire extinguishersFire extinguishers
  • Key accessKey access
  • Guest accommodation disinfected between staysGuest accommodation disinfected between stays
  • Guest accommodation sealed after cleaningGuest accommodation sealed after cleaning
  • Linens, towels, and laundry washed in accordance with local authority guidelinesLinens, towels, and laundry washed in accordance with local authority guidelines
  • Process in place to check health of guestsProcess in place to check health of guests
  • Shared stationery (e.g. printed menus, magazines, pens, paper) removedShared stationery (e.g. printed menus, magazines, pens, paper) removed
  • Staff follow all safety protocols as directed by local authoritiesStaff follow all safety protocols as directed by local authorities
  • Face masks for guests availableFace masks for guests available
  • Hand sanitizer in guest accommodation and common areasHand sanitizer in guest accommodation and common areas
  • Physical distancing rules followedPhysical distancing rules followed
  • All plates, cutlery, glasses, and other tableware sanitizedAll plates, cutlery, glasses, and other tableware sanitized

Policies

Check-in
Check-in
The minimum age for check-in is 20
Pet Policy
Pet Policy
Pets are not allowed
This property does not accommodate bachelor(ette) or similar parties.
License number: 326

Reviews

Value for money:
9.58
Location:
9.49
Staff:
9.76
Facilities:
9.65
Comfort:
9.57
Cleanliness:
9.76
AmesTan
Nov 23, 2025 08:00:00 AM
Review Score:   10
Malaysia
Reviewer Type: Family With Children
Travel Purpose: leisure
Positive: Great host. Very welcoming and warm. Made us yogurt and fruits. Gave us local recommendations too. The house was sparkling clean. Very tastefully decorated too. Will definitely be back again in future.
See All Reviews

Room Arrangement

Room InfoFacilities
Family Room with Balcony
Room Type: Family
Room Size: 16 m2
1 Queen bed(s) Bed
2 Futon bed(s) Bed
Family Room with Balcony

Bathroom

Shower, Free toiletries, Shampoo, Towels, Private bathroom, Toilet paper, Slippers, Hairdryer

Media & Technology

TV, Flat-screen TV

General

Air conditioning, Fan, Trash cans, Tile/Marble floor

Kitchen

Dining table, Refrigerator, Electric kettle

View

City view

Bedroom

Linens

Room amenities

Clothes rack, Drying rack for clothing

Food & Drink

Bottle of water
Quadruple Room with Balcony
Room Type: Quad
Room Size: 16 m2
2 Full bed(s) Bed
Quadruple Room with Balcony

Bathroom

Shower, Free toiletries, Shampoo, Towels, Private bathroom, Toilet paper, Hairdryer

General

Air conditioning, Trash cans

Media & Technology

Flat-screen TV

Kitchen

Electric kettle

Bedroom

Linens

Room amenities

Clothes rack, Drying rack for clothing
Family Room with Private Bathroom
Room Type: Family
Room Size: 16 m2
3 Full bed(s) Bed
Family Room with Private Bathroom

Bathroom

Shower, Free toiletries, Shampoo, Towels, Private bathroom, Toilet paper, Hairdryer

General

Air conditioning, Trash cans

Media & Technology

Flat-screen TV

Kitchen

Electric kettle

Bedroom

Linens

Room amenities

Clothes rack, Drying rack for clothing, Non-feather pillow

FAQ's

Is this Feng Su pet-friendly for guests? 

No, pets are not allowed at this property. Check the guest reviews to learn what guests had to share.

What time is check-in & check-out at Feng Su? 

Check-in time for Feng Su starts counting from 3:00 PM and check-out is until 10:00 AM. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.

Does the Feng Su have a swimming pool? 

No, this Feng Su does not have a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.

How much does it cost per night to stay in Feng Su? 

Best-rates for the Feng Su starts from $41 per night with includes Air Conditioner, Parking, View, Ocean View, Oceanfront, Security/Safety, Sports/Activities, Bedding/Linens, Guest Services, Child Friendly, Internet, Kitchen At SunSki Resorts, we pair every traveler with their perfect accommodation, complete with all necessary facilities. Whether you're traveling with a group, friends, family, or pets, we have the ideal rental for you.

Is Feng Su a family-friendly place to stay? 

Based on the information we have received from the owner or our partner, this is considered to be a family-friendly property. Families have rated this bed & breakfast 3 stars or guests have recommended them suitable for families. As reported by the owner or manager, the bed & breakfast has specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.

Is the Feng Su wheelchair accessible or offer services for disabled guests? 

Based on the information received from our partner, the Feng Su has not specified they are wheelchair accessible. Likewise, there is not an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.

What is the minimum night stay policy for the Feng Su? 

Based on the information reported by the owner or manager, the Feng Su indicates 1 day stay policy at this bed & breakfast. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.

What cancellation policy is in place for Feng Su? 

Based on the information reported by the owner or manager, details for the cancellation policy for the Feng Su are as follows: Cancellation Policy Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.